The water temperature in the pool now is perfect and the sun’s UV rays are not too strong. Therefore, closing of the Centre at the end of March seems irrational.
This summer the weather was very cold, not typical, but this April is going to be warmer than all months before.
It appears that seasons are arriving later each year. The community would benefit if the Council extended the operation of the Centre thus including April for the 2013 as a trial. The opening could be around October 15?
This year the 75 per cent of NSW is inundated and everybody stays at home, an extension of the Centre operation would be appreciated.
George Slominski,
Black Mountain